Cost estimate for make to order products

$
0
0

For cost estimate, is it only done for top level BOM material only?

 

For make to stock products, I can understand it. Cost estimate is only done for the top level material with procurement type E. So only the top level material is entered into CK40N and BOM explosion will take care of it drilling down to all lower level materials.

 

What about make to order products, how is the cost estimate done?

 

E.g. BOM structure:

Level 0- ProductA

Level 1- Option1, Option2

Level 2- Option1compoent, Option2component.

 

When sales order is created for ProductA, either Option1 or Option2 needs to be selected.

 

At which level should cost roll be done? and does it matter for E or E50 procurement type?