Dear experts;
I'm testing a scenario for production with variant configuration, not in the level of sales... and here are the steps:
1- I created a configurable material X with type KMAT, and I created a Configuration profile for this material, with multilevel BOM explosion checked, and all the required settings.
2- I created super BOM with class nodes and some selection conditions and super Routing with no dependencies.
3- I created a finished product Y with type FERT, this one is Configured with all values, and the reference is material X.
4- By testing the configuration simulation for the configurable material X with the values assigned to material Y.. class nodes were replaced perfectly with the needed materials.
5- when creating a production order for the Configured material Y ... it stated that no valid routing, and no valid BOM.
I dunno why the tested BOM in the simulation is not copied to the production order..
Does anyone has any clue ?!